After the meeting, Mu Ying spent two days implementing the viable suggestions that could be immediately acted upon as mentioned during the meeting.
The Iron Refining Camp didn't need to be rushed into construction, so Mu Ying first posted a recruitment notice.
For the stone road construction, she issued a territory task and delegated the placement of the stone road models to the local people.
Otherwise, relying solely on herself, the time and energy required to pave the roads would be too much. It would be better to release the task, allowing the local people to earn some money and Contribution Points, while she could spend more time preparing for the next upgrade.
However, the granary issue did not resolve as smoothly.
She could only design a granary without any special functions; in the end, it was just a spacious big house.
The blueprint design functionality wasn't omnipotent.
For now, she had just built a large granary made of wood and stone at the Public Farm Camp.