As Kisha and the others worked tirelessly outside, constructing the wall, Duke was deep in discussion with Dr. Shuveck and Engineer Steel about the solar panel and sewer system.
Dr. Shuveck, having already examined the solar panel design and the materials required, was well-versed in the project's needs.
However, they were still short on the various sturdy steels necessary for its construction.
With this limitation in mind, the trio focused on strategizing the next steps.
Duke, meanwhile, pondered ways to gather the necessary resources, his mind racing with potential solutions as he considered the best approach to secure what they needed.
On the other hand, Engineer Steel was captivated by the sewer system blueprint featuring gas preservation, which Duke had recently brought to the table.