Chereads / Godnet - Valkyrie Protocol / Chapter 232 - Remote Operation Test

Chapter 232 - Remote Operation Test

Hydraulic systems, check.

Deicer boots and sprayers, check.

Landing struts, check.

Anchor points, check.

Weapon systems, check.

Ammo, check.

In-flight Meal Ready to Eats, check.

Onboard bathroom systems, check. 

External Drop Tanks, Check 

Zeph went down his list of inspection items for the CC A1 Halo while walking around it doing his normal preflight check to make sure that nothing was missed by the AI. Everything seemed to be in order and ready to face the harsh climate of the far northwest and ocean-borne operations. 

The additional de-icing equipment was installed along with the external drop tanks that would be able to extend the flight time and range by a significant margin, giving Zeph the ability to make it to where he needed to go and back to a location where he could refuel if the other parts of the transport team were comprised.

This is the end of Part One, download Chereads app to continue:

DOWNLOAD APP FOR FREEVIEW OTHER BOOKS

Related Books

Popular novel hashtag