Chereads / Crimson's Revenge / Chapter 182 - Filming Starts 01

Chapter 182 - Filming Starts 01

"Alright everyone, so this will be a continuation of the music video we had filmed last time. I know most of you were not part of that filming but I assumed before accepting this project you've watch the MV [1] right?" Hue inquired

All the people present nodded in consent.

"Because of the massive positive feedback of that MV, we have a bigger responsibility of creating a better one."

Some crew members nodded again in approval while others mumbled and talked in whispered voices to exchange opinions and insights.

Hue coughed loudly to get their attention back which worked as the people quieted down.

"I expect to get 100%... No! 200% of your cooperation and skills to create a never before seen short film!" Hue said rallying his staff

"Yes!" all of the crew shouted in enthusiasm, how could they ever fail their boss.

After this, they had a mini party to get to know each other. They also discussed about the song to be used and the film as a whole. Though not all the parts where decided and finalized at least they had a vague idea of how they want the film to be.

This was of course with the occasional and failed little schemes of the three towards Chad and Mirly.

The next day the official filming was to be started. They did not have a proper script only the scenarios were planned so the lines if necessary where impromptu or ideas will be thrown and spontaneously thought by the actors and crew members.

Before starting, Hue explained the purpose for the film today. Similar to the previous MV they did, they will be filming for at least 20 to 30 minutes in various locations. Afterwards they will then choose the best parts or re-film the others if necessary.

This was also the reason why the film will take at least a month before they can finish as first the final script was still being decided and written; second as filming sites will vary based on the proposed scenario for the song. Afterwards, the editing and finalization of the short film as a whole will be done.

They were at a modern contemporary glass filled house inside one of its rooms they covered it with green cloths so when they film Chad and Reen's parts they can just edit it easier.

Another boost for this film is actually Chad's first time singing, he already knew how to sing and would sing in his shows or when he was asked to showcase his talent but this was his first time to sing in an official film.

"This will be like a continuation of the last MV, will add a few flashback scenes from the previous one if necessary when editing is being done." Hue said

"For this scene, we will be filming it in two ways one in Crimson's side while the other is in Chad's perspective, the door will be placed between them while Chad sings." He continued

The crew nodded then they went to their own positions. They created a mahogany door with intricate designs with a metal handle which they placed in the middle of the room. They placed it in the middle with blocks to support it to stand straight.

[1] Music Video