The dwarf construction team had completed the upgrading works of the two dormitory buildings and main dormitory building in advance. Only the factory workshop was still undergoing some finishing work.
After the system received the acknowledgement from Mag, it, too, started its renovation works with a lightning fast speed. It added in the wooden beds, showers, toilet bowls, and whole sets of beddings and life necessities. Every single level was also connected with a potable underground water supply.
There were very few female elves among the 1000-plus elves. There were just 150 of them, so they were assigned to the smaller dormitory building.
The male elves were assigned to the main dormitory building, and the other smaller dormitory building was left as a backup.
Mag didn't have to do the assignment of bedrooms and beds, as Irina's adjutant had already arranged them clearly.