Having lived up to Jiang Chen's expectations, the Graphene Research Institute of Future Heavy Industries came up with a solution that would turn the kind of floating plantation he conceived into reality.
One hundred acres of floating plantations were on the southwestern waters of Penglai. They were connected by graphene ropes. Under the force exerted and received, each floating plantation was as stable as flatland. While on the plantations, there was no feeling of bumpy waves at all.
The output of sap was collected by the staff on the floating plantation and poured into the designated area. Through the graphene pipes that connected plantations to each other, the sap was transported to storage tanks, awaiting tankers to transport them to the refinery on MLL Island to be refined into fuel and other petrochemical products.