It took two months and 29 days to completely furbish the underground base with necessary life support.
The temporary base was separated into three levels. The top level, also the biggest level, was designated as residential area. It could accommodate up to 80,000 people. Other than that, this level was also where amenities like communal cafeterias and bathrooms could be found.
The middle level was also going to be a residential area. It could accommodate 50,000 people. The combination of these two levels could house most if not all of the Hope’s general citizens.
The last level was the industrial area. All assembly lines that were constructed in the past two months were here. Production of spare parts, technological goods, the three shuttles, as well as the external cabin were this floor’s responsibility.
Although temporary, the base was responsible for the lives of 120,000 people. If it were to fall, it would handily wipe out humanity’s last hope.