Fuel processing and refining production line!Or to be more professional, it should be called fuel processing and refining filtration production line, with the word "filtration" added.From the name, it is not difficult to see that it is actually a very simple equipment. If it is crude oil refining, it is much more complicated. Of course, if it is simply to extract gasoline and diesel from crude oil, and a little other substances, it is not complicated.It should be noted that as early as the ancient Tang Dynasty, people were able to refine fuel from crude oil, but the refining technology at that time was really terrible, but relying on some local methods, fuel could be refined.It can be seen that simply refining fuel is not as complicated as imagined.Why are the two oil companies and a crude oil refining base so large and complex? It is because the crude oil refining base they built is originally composed of multiple modules.In addition to fuel oil refining, there are also "eight or nine zero" other substances that are refined, which are also carried out in the entire crude oil refining base.Connect with the oil pipeline in the oil depot area that has been reserved for a long time, and then reset the control software. After that, everyone will evacuate and stay away from the equipment to prevent accidents and injuries."Start!"Zhang Heng shouted two words, not voice control, but his hands also clicked the button in the control platform at the same time. It was part of the debugging process, not physical debugging, but to see the operation of the equipment first.The roar was not that loud, equivalent to the sound of a domestic excavator at work. It can be said that the voice has been well controlled.Staring at the control platform without blinking, it has a debugging module and can also see the real-time status of the equipment on the entire production line.If there is a problem, it will display the fault.If no one handles it after a period of time, the power will be cut off and the operation of the production line will be terminated.It is one of the production line protection mechanisms.Everything is normal!Zhang Heng ignored it and kept it running.The whole process lasted for half an hour.Make sure there is no problem before taking the next step."Inlet oil pipe docking!"Zhang Heng gestured that this job was not difficult.There were a total of 12 oil pipe inlets and 12 oil pipe outlets outside the factory, half for gasoline and half for diesel.They only needed to be connected and reinforced, and even welding was not required: "It can be considered a trial production.If there are no problems with the trial production, it will be completely completed. "We will connect it now!"Qian Tiemu was also happy for his boss, and at the same time, he felt more joy in his heart.This joy came from the army he had served in.Everyone who came here knew very well what company they worked for, and naturally knew that the fuel produced by this fuel production line was supplied to the army.Now the production The production line has entered the full-production stage.It won't take long before a large amount of fuel can be supplied to the troops.The new and powerful fuel can directly improve the combat effectiveness of the troops. As a former member, although I can't go back, it's not too much to be happy about it, right?One diesel, one gasoline, two oil pipes are connected!The valve is opened, Qian Tiemu also ran to the oil depot area not far away to open the oil output of the two oil depots. Otherwise, if there is no oil from the other side, it will be useless to connect here, and there will still be no oil coming through the oil pipeline.Everything is ready!The trial production officially begins.One minute.Two minutes!Ten minutes!Half an hour!It ran for another half an hour without any problems."Okay, that's all for today!"Zhang Heng made a light stroke and waved his hand: "Everyone will go to rest, leave the rest to me, take samples and check, if it is qualified, it will be completely completed."This kind of thing should not be done by others. Whether it is the design of the oil depot area, the distribution of the oil depot, and the connected oil pipeline, including the installation of this production line, a maze was set up, and some places he was sneaky and did not let people know.It was because he knew very well that the fuel refined by this production line was not two new types of mixed fuel, but ordinary aviation fuel and high-quality diesel.In this case, it is even more impossible to use others' hands, otherwise all the cover-up work would be in vain.The oil depot marked as gasoline 18 opened the small valve and took samples, and then went to the diesel 16 oil depot to take samples, and then drove away directly.Originally, the oil outlet pipelines connected to the production line in the factory should be gasoline 6 and diesel 8, but he did not go to those two to take samples. This is one of his mazes.In fact, it is not really a maze.This starts with the entire oil depot area, which can be divided into five modules, one module is the crude oil depot, one module is the diesel oil depot, and in addition, there is another diesel oil depot.Similarly, the gasoline depot is the same, but it is divided into two modules, a total of five modules.In these five modules, the oil depots of each module, as long as they are of the same type, are connected together. You can transport oil to this oil depot, or you can transfer oil to another connected oil depot.This also leads to the entire oil depot area, which is densely packed with large oil pipelines, which are intricate and sometimes you can't tell which oil depot a certain oil pipeline is connected to.After all, the connection is not single, but two-way, which is equivalent to doubling the number of oil pipelines, half of which are buried underground, which is more complicated and confusing.Sometimes, just a little trick between two oil pipelines is enough to change the fuel from one oil depot to another.He did the same thing, otherwise how could he conceal his tracks?Took samples!It was impossible to have a professional organization inspect them, and there was no need for that.He returned to Warehouse No. 1 and placed the two sample storage tubes there. He then issued a command in the signal float. When the mining ship returned, he would take the samples away.The city store would directly give the inspection results.Sure enough!After just over an hour, there was an additional message on his mobile phone. It was the inspection report sent to him by Smart No. 1. There were no accidents and it met the indicators.At this point, it could be declared that the production line was completely completed, and the products produced by 4.3 met expectations, with no problems at all."Speaking of which, the equipment on the first floor of the factory building looks like one set, but it is actually two sets. The diesel and gasoline are separate, but they can be combined."Zhang Heng breathed a sigh of relief. The test results reached the target, which means success. It can be said that it is a relief. It would be thrifty not to celebrate: "Go to sleep, we have to continue tomorrowOnly one set is installed, and there are still five sets?After that, there are two smelting production lines in the factory building, which also need to be installed and debugged, etc.The workload is really not small.Fortunately, the smelting production line is relatively not so complicated, but no matter how simple it is, the installation process still takes a certain amount of time, and it is not as simple as imagined.The revolution has not yet succeeded, and comrades still need to work hard.