Chereads / Constructing-Style Wizard / Chapter 1210 - 382. New Mechanos_2

Chapter 1210 - 382. New Mechanos_2

After arriving at the manor in the sub-dimensional realm, the first thing Noland Lee saw was Mechanos transporting building materials and constructing houses under Nolin's command.

Dodging this busy group, Noland Lee headed to the open-air Mechanos manufacturing factory built near the manor.

This was a place for assembly-line production of Mechanos, currently equipped with a warehouse for storing alchemy materials, three conveyor belts for transporting materials and parts, a series of mechanical operation desks for assembling Mechanos and engraving Array patterns, and a platform for testing the finished Mechanos.

With sufficient raw materials and a stable energy supply, this production line, entirely manned by Mechanos as workshop workers, could manufacture between 30 and 50 specific models of Mechanos each day.

All Mechanos manufactured from the production line were used to assemble new lines, further boosting the output of Mechanos.

This is the end of Part One, download Chereads app to continue:

DOWNLOAD APP FOR FREEVIEW OTHER BOOKS

Related Books

Popular novel hashtag