Chereads / Project Overworld / Chapter 107 - Last preparations

Chapter 107 - Last preparations

After another few weeks of intense work, Spacol members were finally seeing the end of the tunnel with their current projects. Most of the induction furnaces and the three-dimensional printers Keith had planned to launch on the Moon were finished and almost two third were already up and running on the natural satellite.

Thanks to the cameras Leyla insisted on equipping onto one of their robots, they managed to see the progress of the construction of their dwellings. This process was quite a bit slower than they initially expected, but steady nonetheless.

The 'Moon explorer' as the group of friends called their camera robot, was also meant to be receiving order through radio waves. Because of that, Keith has been able to test the rigidity of their base walls by headbutting them and was pretty satisifed about the result.

This is the end of Part One, download Chereads app to continue:

DOWNLOAD APP FOR FREEVIEW OTHER BOOKS