Based on the report by Team Alpha , the committee agreed on powering the
whole Australia with the element . After the few days , the setup to power was
ready . The element was carried to the EDRO centre at Canberra. The element
was placed in a special isolated heat chamber which was better than the old one.
A lot of wires were connected to the element . The first test was successful . But
Jimmy and Samair were not present at the test due to their suspension .
Soon after days of continuous electricity generation , the element started to lose
its power , heat and color . Everyone thought to give it a rest of few days . But the
wires were still connected . Joltium started to regain its heat and electricity , but
due to the wires still connected and all the switches off , the generated electricity
started to contain in the wires . After a couple of days , the team got back onto its work . The switches when switched on , released a huge amount of electricity . Due to this
reason , every circuit board , every appliance , every wires , all of them got fried .
Once again , Australia was under the dark . The committee was forced to play the
amount of $600 billion to Australia . The committee then removed the
suspension over Jimmy and Samair , accepted their report .