Day 57 – 4:43 PM - J.W. Diokno Blvd., North District, Bay City Settlement, Pasay City, Metro Manila
The [Exceed Convertible Transport Type-1: Disintegrator Fortress] was one of the few designs he thought up last night together with the [Exceed: Personnel Transport] that he had just finished making.
Unlike the [Exceed: Personnel Transport] which did more of just reshaping and equipping the MB Sprinter, the design he chose for the Lorry needed more of building things from scratch with the truck as the foundation and core. It was unlike the MB Sprinter that was fully designed. The Lorry only had its tractor unit shaped and the semi-trailer was nothing but a cage made of metal.
That was why with that cage as the support, he could shape the Lorry in any way he wanted as long as the changes did not affect the capacity and speed of the vehicle.