After renting the factory and converting it into a charging facility, Chen Jin made three trips with his car to bring 200-plus large high efficiency batteries and another 200-plus smaller ones into the charging facility. Da Qiang was put in charge of charging them. With the charging capability of the facility, it would take a maximum of two days to fully charge all of these high efficiency batteries.
The home cable from the toilet that was pulled into the campground would not be retracted. But Chen Jin would control his use of electricity through that cable such that it would not reach ridiculous levels of tens of thousands of kilowatts per hour. Thus, the power shortage was temporarily resolved.